ZC - Ⅱ/Ⅲ mechanical rotary blowback flat bag filter
2016-04-24 15:39:00 From:本站 View:476

ZC - Ⅱ/Ⅲ mechanical rotary blowback flat bag filter in detail
一, ZC - Ⅱ/Ⅲ mechanism of mechanical rotary back flat bag filter structure:
1, on the top of clean room, check the filter should be shut down, cut off power supply, pay attention to safety, and at the same time two operations, prevent start fan, manhole door was closed or spiral arm rotating absorption, cause deaths and injuries.
2, often should pay attention to any dust discharge under the exhaust duct, if found to have take ash phenomenon, should clear up in time, to rule out.
3 dust remover, the outdoor work, should be periodically kao shovel paint, prevent rust.
4 parking, regularly check the filter bag, found that the filter bag filter bag is damaged should be transferred in good time.
5 and reverse blowing control system should be regularly check and prevent failure.
6, ash hopper dust should be regular cleaning, not too much.
7, should be regularly check the blowing the arms is normal.
8, the transmission components shall be oil on a regular basis.
二, ZC - Ⅱ/Ⅲ mechanical rotary blowback flat bag filter maintenance:
1, after the installation, filling lubricant to the transmission parts and then try to turn the check whether the gear reducer is reversed, such as inversion, rewiring immediately, in order to avoid attaint parts, officially launched again is correct.
2, after the lid closed, should try its rotation is flexible, roof and clean outdoor application rubber seal ring junction, guarantee the right under the roof sealing.
3, filter bag outside the framework of the filter bag (fluff took), mouth mouth with layering and bolting, prevent leakage, and then carefully inserting plate medium (note that don't make the filter bag cut or scratch, tail cone inserted into the bottom bracket shaw corresponding location ring, rubber ring is put on the upper guide box below the mouth after oblique shaw with press pressure.
4 and reverse blowing slewing transmission mechanism when installation should pay attention to vertical, up and down the arms swing plane parallel to the frame on the guide plane and 2, 4 mm distance. Rotating flexible, tuyere tilter position properly, a clash of heads with flexible turning right.
5, flower board trapezoid hole should be vertical with the corresponding location on the bottom bracket circle, prevent into the filter bag frame after flowing skewed gas leakage.
6, flower board and the bracket, bracket and put between circle should be embedded into the packing, then tighten bolts and adjust, turn the arm plate plane and reverse blowing mouth parallel and guarantee 62 mm distance.
7, the door into the hole, explosion-proof door, observing the place such as holes, are due and rubber strip, to ensure its tightness.
8, ash hopper filter chamber shell, clean room and so on various flanges shall be embedded into the packing to tighten bolts, prevent leakage.



Product List
Contact Way
Telphone:86 0533 4651589
Mobile:13589518127
FAX:86 0533 4651589
ADD:Zibo city boshan area bo lai is high-speed intersection
Website:www.sdbaogang.com
Friend Links:
Copyright (C) Boshan baogang mechanical factory All rights reserved. ADD:Zibo city boshan area bo lai is high-speed intersection
Tel:0533-4651589
信息公示